Liquid line magnetic ferrous traps designed to extract remove the ferrous materials from liquid and slurry lines in order to purify the material in the production process. Strong magnetic traps filter the flow and extract the unwanted ferrous metal. While the slurry and liquid flows around the magnetic tubes, a very strong magnetic field (generated by the neodymium NdFeB magnets inside of the tubes) traps all metallic particles on the surface of the tubes.
In the course of manual cleaning the inner part of the separator is taken out, the magnetic cores are pulled out of the tubes (by operating lever) and the captured magnetic impurities fall off the tubes spontaneously.
Â
Application for high performance liquid ferrous metal trap magnets :
 As advanced liquid trap magnets,These easy cleaning in pipeline metal trap magnets are an ideal magnetic traps for removing super fine ferrous contamination from materials of liquid,Semi-liquid lines or air-conveying lines experienced in most cases with no appreciable pressure drop or reduction in flow rates. All units incorporate a sump type housing to trap ferrous particles. Liquid Traps may be installed horizontally, vertically, or on an angle without affecting their magnetic efficiency.


Technical Parameters
NO. | Model | Diameter of the drum (mm) |
diameter of  the pipeline    (mm) |
Quantity (piece) |
Weight (kg) |
Interface mode |
1 | RCYJ150/40 | 159 | 45 | 5 | 19 | F/C |
2 | RCYJ150/50 | 159 | 57 | 5 | 21 | |
3 | RCYJ150/65 | 159 | 76 | 5 | 23 | |
4 | RCYJ200/50 | 200 | 57 | 7 | 35 | |
5 | RCYJ200/80 | 200 | 89 | 7 | 38 | |
6 | RCYJ200/100 | 200 | 108 | 7 | 43 | |
7 | RCYJ250/100 | 250 | 108 | 9 | 43 | |
8 | RCYJ250/125 | 250 | 138 | 9 | 45 | |
9 | RCYJ250/150 | 250 | 159 | 9 | 48 | |
10 | RCYJ300/125 | 300 | 138 | 9 | 60 | |
11 | RCYJ300/150 | 300 | 159 | 9 | 64 | |
12 | RCYJ300/200 | 300 | 219 | 9 | 70 | |
Note:The installation and the magnetic intensity can be customerized according to the users'specail requirements. |
FAQ
Q: Are you a factory ?Â
A:Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q:Â Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
 Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 45 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.      Â
 Q:Guarantee period:
   A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
  A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?
A:Â Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.Â
Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement. Â Â
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3Â Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.Â
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.Â
PACKAGE & Ship:

Work Shop View:

Â

 Introduction:
Liquid line magnetic ferrous traps designed to extract remove the ferrous materials from liquid and slurry lines in order to purify the material in the production process. Strong magnetic traps filter the flow and extract the unwanted ferrous metal. While the slurry and liquid flows around the magnetic tubes, a very strong magnetic field (generated by the neodymium NdFeB magnets inside of the tubes) traps all metallic particles on the surface of the tubes.
In the course of manual cleaning the inner part of the separator is taken out, the magnetic cores are pulled out of the tubes (by operating lever) and the captured magnetic impurities fall off the tubes spontaneously.
Â
Application for high performance liquid ferrous metal trap magnets :
 As advanced liquid trap magnets,These easy cleaning in pipeline metal trap magnets are an ideal magnetic traps for removing super fine ferrous contamination from materials of liquid,Semi-liquid lines or air-conveying lines experienced in most cases with no appreciable pressure drop or reduction in flow rates. All units incorporate a sump type housing to trap ferrous particles. Liquid Traps may be installed horizontally, vertically, or on an angle without affecting their magnetic efficiency.


Technical Parameters
NO. | Model | Diameter of the drum (mm) |
diameter of  the pipeline    (mm) |
Quantity (piece) |
Weight (kg) |
Interface mode |
1 | RCYJ150/40 | 159 | 45 | 5 | 19 | F/C |
2 | RCYJ150/50 | 159 | 57 | 5 | 21 | |
3 | RCYJ150/65 | 159 | 76 | 5 | 23 | |
4 | RCYJ200/50 | 200 | 57 | 7 | 35 | |
5 | RCYJ200/80 | 200 | 89 | 7 | 38 | |
6 | RCYJ200/100 | 200 | 108 | 7 | 43 | |
7 | RCYJ250/100 | 250 | 108 | 9 | 43 | |
8 | RCYJ250/125 | 250 | 138 | 9 | 45 | |
9 | RCYJ250/150 | 250 | 159 | 9 | 48 | |
10 | RCYJ300/125 | 300 | 138 | 9 | 60 | |
11 | RCYJ300/150 | 300 | 159 | 9 | 64 | |
12 | RCYJ300/200 | 300 | 219 | 9 | 70 | |
Note:The installation and the magnetic intensity can be customerized according to the users'specail requirements. |
FAQ
Q: Are you a factory ?Â
A:Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q:Â Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
 Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 45 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.      Â
 Q:Guarantee period:
   A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
  A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?
A:Â Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.Â
Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement. Â Â
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3Â Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.Â
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.Â
PACKAGE & Ship:

Work Shop View:

Â

Â
The fundamental reason why leather is soft is that when leather is made, oil is introduced into the interior of animal skin to form an oil film that completely covers the surface of the fibers inside the skin, that is, a layer of oil film with appropriate thickness is used to separate the surface of the fibers inside the skin. In this way, the friction between the fibers inside the leather is equivalent to the friction of the oil molecules, so the leather will be very soft. Its principle is similar to that of sponge, but the difference is that the inner surface fibers of dermis are separated by oil film, which makes the inner surface of dermis have sliding pores, but its pores are smaller than that of sponge, and the distribution of the inner surface fibers of dermis is not as regular as that of sponge.
Leather cleaner is used to clean leather clothes, leather sofas, leather bags, leather chairs, leather shoes and other leather products. Leather cleaning generally refers to the cleaning of the surface of leather products, excluding the cleaning inside.
Leather Care product,Leather Cream,Sofa Cleaner & Polish,Leather Care Cream
Jiangyin yinghuameng Houseware Co.,Ltd. , https://www.nbcare-guys.com